Stallion Plant is long established in the examination and testing of construction plant and lifting equipment relevant to the LOLER and PUWER Regulations.
We have earned an excellent reputation throughout our field dealing with independent owner-driver operations up to large national companies.
We are committed to working alongside our clients to ensure they are kept within the law, with the minimum amount of disruption to the daily running of their business
As we are fully independent, our clients are guaranteed impartial advice, free from any conflict of interest.
Site management and officials are increasingly requiring the correct certification for plant on their site, this can cause costly down time should the relevant paper work not be readily available.
PUWER: The Provision and Use of Work Equipment Regulations 1998
This regulation applies to safe use of work equipment, including mobile and lifting equipment. The purpose of the inspection is to identify whether equipment can be operated, adjusted and maintained safely and that any deterioration (such as defect, damage or wear) can be detected and remedied before it results in unacceptable risks.
Stallion Plant Services Ltd can provide a thorough examination and inspection for any plant or lifting equipment that is affected.